2018 - 2019
CAIA Engineering S.A.S.
Impala Terminals Colombia SAS
Mitigation projects, Transportation, ISO 14064 Verification, Oil and gas sector
Colombia
Completed
Atmosphere performed the project's emission reduction calculations in preparing the mitigation project report, monitoring report, and provided training to Impala Terminals for the external audit. Subsequently, it guided the client through the applicable registries and validation and verification bodies in order to register the project in a recognized carbon scheme for the issuance of carbon credits.